Masonic Village’s 3 MW solar power system produces 3.4 million kWh per year and approximately 15% of the campus’ electricity. It generates a rate of return of between 14 and 20% and results in cost savings of $250,000 annually.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed